We are proud of the quality we have brought to these exciting projects. Please contact us today to discuss your project needs. Click here to send us an email. We will contact you to make an appointment.


Historical Restoration
National Park Service
NIKE MISSILE SITE
Marin County, CA
 Nike missel site    

The restoration to the historical Nike Missile Site included epoxy coating and open-array radar, structural and cosmetic rebuild of the guard station, the refurbishing of the generator electrical service building, and the slurry seal and striping of all paved areas.


Façade Demolition & Restoration
AVIS RENT-A-CAR
San Francisco, CA
     

This project involved demolition of exterior façade while maintaining public safety and public access to the Avis facility. Protective measures were in place for access to the public walkway as well as traffic control on this busy downtown San Francisco thoroughfare.


Structural/Seismic Projects
L-3 COMMUNICATIONS
San Mateo County, CA
     

We completed an entire seismic retrofit of the 30,000 square foot test building after high winds had torn apart the roof-top spheres. It was necessary to maintain a positive pressure at all times during construction so the spheres could remain intact.


Interior Remodel
NAVAL POSTGRADUATE SCHOOL
Monterey, CA
     

This project included the complete renovation of eight Officers Quarters at the Naval Postgraduate School, including bathrooms, kitchens, living areas and bedrooms.


Interior/Exterior Renovation
SUNSET PUBLISHING CORPORATION
Menlo Park, CA
     

The interior renovations at one of California’s foremost magazine publications included office space and common areas.


Interior Renovation
FISH & WILDLIFE
BUREAU OF RECLAMATION
Sacramento, CA
     

These office expansion projects included the construction of new walls, installation of acoustical ceiling, carpet, paint, doors and hardware.


Tenant Improvement
ALLSTATE RESEARCH & PLANNING CENTER
Menlo Park, CA
     

The interior renovation at Menlo Park’s Allstate Research & Planning Center included a retrofit for a newly upgraded elevator. The conference room renovation included ceiling, flooring, wall covering and lighting upgrades as well as floor monuments for phone and data/cabling access.


Tenant Improvement
PEPSI BOTTLING COMPANY
Benicia, CA
     

This two-story fast-track renovation was completed in a 6-week scheduled timeframe. Work was performed around the warehouse, which remained in operation during construction.
In addition to the installation of a new HVAC system, the lunchroom, bathrooms, conference room and office areas were all remodeled.


Clean Room
BIO-RAD LABORATORIES
Richmond, CA
     

This class-100 clean room at Richmond’s Bio Rad Laboratories is used to manufacture pharmaceutical products.
In addition to the clean room, a support area, break rooms, a light manufacturing area and several offices were included in this upgrade.


Historic/Seismic Installation
NATIONAL PARK SERVICE
San Francisco, CA
     

The installation of the Farallon Islands Fresnel Lighthouse Lens included the reassembly of the lens, fabrication of the pedestal and chimney as well as the bull gear and motor for rotation. We also installed the 6,000 pound ship’s propeller. Painstaking precision was needed as both historical pieces required bolting and grouting for seismic stability. They are on display at San Francisco’s new National Park Service Visitor’s Center.


Design/Build Remodel
COMCAST
San Francisco, CA
     

This was a Design/Build renovation of office and warehouse into offices, warehouse, television studio and control room. Marshall/Dubas Construction was the Prime Contractor. The Control Room contains electronic equipment and computers that require specialized air conditioning and clean electrical power.
The total value of this project was $1.1 million. 

 